News

Phase 2 of E-Harbour Uithoorn Completed: 40 Additional Berths at the Wilhelminakade

30 August 2026

E-Harbour Uithoorn completed phase 2 of its marina development in August 2026. With this expansion, 40 additional berths have been realized at the Wilhelminakade in Uithoorn, open to both fuel-powered and electric boats, with a growing number of berths offering shore power.

Ready for the Future, Open to Everyone

E-Harbour Uithoorn is expanding its number of shore-power berths step by step, so shore-power capacity is always available and grows in line with demand. At the same time, it’s a practical choice: boats with a combustion engine remain just as welcome, since electric boating, unlike in cities such as Amsterdam, is not yet mandatory in Uithoorn. By welcoming both types of boats and expanding shore power where needed, the marina stays widely accessible while preparing for the continued rise of electric boating.

40 Additional Berths at the Wilhelminakade

The expansion adds 40 berths at the Wilhelminakade, located directly on the Amstel River, including berths with shore power. With this growth, E-Harbour Uithoorn offers more boat owners in the region a place to moor, right in the heart of a lively recreational area.

Next Step for E-Harbour Uithoorn

With the completion of phase 2, NAUD takes an important step in the further development of E-Harbour Uithoorn as a future-proof marina. The marina continues to grow into a harbor where traditional and electric boating have a place side by side.

Contact met Naud

Meer informatie? Neem contact met ons op

Reageer en krijg binnen 24 uur reactie

"*" indicates required fields

This field is for validation purposes and should be left unchanged.